NACHRICHTEN
Suche
Close this search box.

Sustainability, a commitment for Symaga Group

The installation of a photovoltaic solar energy generation plant to power our factory in Villarta de San Juan is one more step in the commitment to sustainability and respect for the environment, which we already consolidated in 2018, with Environmental Management System ISO 14001.

One of the covers of our buildings has been used to install a system of solar panels that will generate green energy. This first phase will supply 25% of the total energy consumed in Symaga Group, aiming to 100% in the second phase.

Within Symaga’s Continuous Improvement for Manufacturing Plan, the entrance to the plant has been reorganized at a logistical level, improving the internal traffic of trucks and vehicles and parking spaces, for over 3,500 trucks that come and go every year within our factory . Two buildings have been rebuilt, the first to control the entry and exit of vehicles, with a room to give Occupational Risk Prevention to all visitors and the second building with a new Training and Meeting room for Production team. Symaga Group maintains its philosophy of continuous improvement. The reduction of energy costs and logistics improvement, in the end, increase efficiency and competitiveness of our company and our silos, and reinforce the company’s commitment to reduce the environmental footprint.

Video dron: https://www.youtube.com/watch?v=2ICYNx2e1cg

Comparte en rrss: